Bringing Environments to Life
Inviron news >>>
01/09/2010 - Installation at state-of-the-art Care Home
read more >>
13/08/2010 - New West Midlands maintenance contract
read more >>
30/06/2010 - Great British Summer
read more >>
case studies > The Hub - University of Westminster
The Hub - University of Westminster

Location: Central London

Technical Solution:
Mechanical and Electrical Installation

Client: Osborne

Project Description:

The "Hub" building was constructed within a busy university campus. The site, which was bounded on all sides by occupied buildings, posed significant challenges as "quiet" methods had to be utilised to avoid disturbing students.

The new structure provides a link to all the surrounding buildings and incorporates:

  • Cafes at lower ground, ground and first floor levels
  • Classrooms on lower ground and first floor levels
  • Conference rooms and a function pavilion
  • Student shops
  • Social areas
  • AV room
  • Toilets and disabled facilities

The contract, which was awarded to Inviron by main contractor Osborne, was started in May 2005 and completed on time and within budget in October 2006.

Scope of Works:

  • Air Handling Units
  • Hot Water Tanks
  • Circulation Pumps
  • Gas Services
  • Above Ground Drainage
  • BMS Controls
  • LV Switchboards and Distribution
  • Fire Alarm
  • CCTV
  • Disabled Call System
  • Lighting and Lighting Control

Osborne website: www.osborne.co.uk

Inviron
search >
  • case studies
  • contact us
  • terms & conditions | copyright | sitemap | text only | links
     
    invirondna™