Centrica Rough Platform

Centrica Rough Platform

Location:
The Centrica Rough Platform, North Sea

Technical Solution: Custom Built Air Handling Units

Project Description:

Inviron Marine Systems have supplied two custom built air handling units and associated condensing units for Centrica's North Sea Rough Platform.

These new units replace the original units that had reached the end of their useful life. The units had to be designed to deliver the original performance requirements and fit the existing space envelope and ducting connections.

The contract was awarded by RBG Ltd.

 

Inviron