Location: Martlesham, Suffolk
This project for the provision of all construction, mechanical and electrical services, with Inviron as principal contractor, included the complete removal of the existing office areas and conversion to a fully air conditioned and supported technical suite.
Following detailed negotiations with the client the project developed from a server hosting facility to a fully equipped technical suite having a capacity of approximately 300 data racks.
Owing to the logistics of the suite, dedicated plant compounds were required together with a full HV upgrade and generator/UPS support. Also required were two further power supply upgrades, which involved the supply and installation of standby diesel generating sets rated at 625kVA and 500kVA.
|