Location: Adastral Park Martlesham, Suffolk
Technical Solution: Construction Management, Mechanical and Electrical Installation
Project Description:
This project for the provision of all construction, mechanical and electrical services, with Inviron as principal contractor, included the complete removal of the existing office areas and conversion to a fully air conditioned and supported technical suite.
Following detailed negotiations with the client the project developed from a server hosting facility to a fully equipped technical suite having a capacity of approximately 300 data racks.
Owing to the logistics of the suite, dedicated plant compounds were required together with a full HV upgrade and generator/UPS support. Also required were two further power supply upgrades, which involved the supply and installation of standby diesel generating sets rated at 625kVA and 500kVA.
The project started in February 2007 was completed on time and within budget in June 2007.
Scope of Works:
Mechanical
- 3 x 600kw chillers
- Humidifiers
- Leak Detection
- Air Conditioning - 20 Downflow Units/Ventilation
- Thermal Insulation
- Building Management System
- Full IST and Heat Load Test
Electrical
- HV Transformer/Ring Main Unit
- HV Switchboards and HV Cabling
- LV Switchboards and LV Distribution
- Mains and Sub Mains Cabling
- 2 x 625kVA UPS and External By-Pass Switch
- IPDU's
- Vesda Fire Alarm
- Energy Efficient Lighting Controls
- 2MW Containerised Diesel Generating Set
- Bulk Fuel Storage Tank
Construction
- Raised Access Flooring/Suspended Ceilings
- Structural Openings/Security Walling Access
- Plantroom Compounds/Bases
- Trenching
- Fire Precautions/Escapes
- Fire Escapes/Steel Work Gantry
- Oil Tank Removals
|